The Kerala High Court has ruled that approval granted by the Petroleum and Explosives Safety Organisation (PESO) for a revised petrol pump site plan does not eliminate the requirement of a fresh No Objection Certificate (NOC) from the Additional District Magistrate (ADM).
A Division Bench comprising Justice Devan Ramachandran and Justice Basant Balaji held that the ADM must independently examine the revised plan under Rule 144 of the Petroleum Rules, 2002, even if an earlier NOC had already been issued for a previous layout.
Background
The case arose from a proposal to establish a retail petrol pump in Pinarayi, Kannur, on the basis of a Letter of Intent issued by Bharat Petroleum Corporation Limited (BPCL).
The proposed dealer initially obtained PESO approval for the site plan. However, the ADM refused to issue an NOC. Following successive rounds of litigation, the dealer modified the site plan and secured PESO approval. The ADM subsequently granted an NOC on October 6, 2025.
Meanwhile, local residents and the manager of a nearby school challenged the NOC, raising concerns about mandatory distance requirements, traffic conditions and the safety of schoolchildren.
During the proceedings, the dealer submitted a third revised site plan, which PESO approved on March 2, 2026. The revised layout included a change in the location of the fuel dispensing unit.
The Single Judge directed the ADM to reconsider the NOC in light of the third site plan. Both the dealer and BPCL challenged that decision before the Division Bench.
The Bench examined Rule 144 of the Petroleum Rules, 2002, which requires the District Authority to consider relevant factors before issuing an NOC. These include traffic density, local development planning, the presence of schools and hospitals, road safety and access for fire services.
The Court emphasised that granting an NOC is not a routine administrative exercise.
"The NOC issued by an ADM is not a formality; or the culmination of a mechanical process; it surely cannot be allowed to be so either. There is a serious and important purpose behind Rule 144 of the Rules."
The Bench also noted that a school was situated immediately adjacent to the proposed petrol pump site. However, it clarified that the presence of a school does not automatically prohibit the establishment of a petrol pump. Authorities must carefully examine the relevant safety concerns and balance the interests involved.
Rejecting the argument that the earlier NOC was sufficient, the Court held that the third site plan required separate consideration because the previous NOC had been issued with reference to the earlier layout and its proposed installations.
"The rigour of Rule 144 cannot be diluted or watered down, lest it may create catastrophic and cataclysmic consequences in future, on account of events which cannot be anticipated, particularly in the case of a highly inflammatory product like petroleum."
The High Court clarified that the third site plan, despite having PESO approval, must be examined by the ADM under Rule 144 before a fresh NOC can be issued.
However, the ADM was not required to restart the entire inquiry. The authority was directed to assess the inputs and reports already available on its records, including the police comments obtained earlier.
The Bench directed the ADM to consider the application in accordance with Rule 144 and complete the exercise within six weeks from receiving a copy of the judgment.
The appeals were disposed of with these directions.