(1) Where goods are required to be loaded at a siding not belonging to a railway administration for
carriage by railway, the railway administration shall not be responsible for any loss, destruction, damage
or deterioration of such goods from whatever cause arising, until the wagon containing the goods has
been placed at the specified point of interchange of wagons between the siding and the railway
administration and a railway servant authorised in this behalf has been informed in writing accordingly by
the owner of the siding.
(2) Where any consignment is required to be delivered by a railway administration at a siding not belonging to a railway administration, the railway administration shall not be responsible for any loss, destruction, damage or deterioration or non-delivery of such consignment from whatever cause arising after the wagon containing the consignment has been placed at the specified point of interchange of wagons between the railway and the siding and the owner of the siding has been informed in writing accordingly by a railway by a railway servant authorised in this behalf.
(2) Where any consignment is required to be delivered by a railway administration at a siding not belonging to a railway administration, the railway administration shall not be responsible for any loss, destruction, damage or deterioration or non-delivery of such consignment from whatever cause arising after the wagon containing the consignment has been placed at the specified point of interchange of wagons between the railway and the siding and the owner of the siding has been informed in writing accordingly by a railway by a railway servant authorised in this behalf.